83643 | Limekiln Pike (Bridge)o/SEPTA RR (Abington Township, Montgomery County)
This project includes the replacement of the bridge superstructure carrying Limekiln Pike over the SEPTA Lansdale/Doylestown Line. The existing structure is a single span adjacent concrete box beam structure that is approximately 76 feet long and 58 feet wide. The project will be constructed under traffic, maintaining one lane in each direction. The proposed bridge superstructure will also be 58 feet wide. The existing roadway has two 11 foot lanes and two 13 foot lanes and two 4 foot sidewalks and two protective exterior walls due to the electrified powerlines for SEPTA. Utility lines above the sidewalk may need relocation to facilitate construction. Protection of SEPTA catenary and transmission lines will be required. Construction operations will need to be coordinated with SEPTA to not impact the Lansdale/Doylestown Line services.
A final alternative for bridge rehabilitation or replacement is determined upon federal National Environmental Policy Act (NEPA) or state Categorical Exclusion clearance.
Phase | Fund | FY23 | FY24 | FY25 | FY26 | FY27-34 |
---|---|---|---|---|---|---|
CON | STU | $289 | $0 | $0 | $0 | $0 |
Program Year Totals: | $289 | $0 | $0 | $0 | ||
Total FY23-FY26 Cost: | $289 | Total FY23-FY34 Cost: | $289 | |||
All costs in thousands. |
Phase | Milestone | Estimated Date |
---|---|---|
CON | Phase Approved by PMC | |
CON | Final ROW Clearance | |
CON | Final Utility Clearance | |
CON | 4232 Approved by FHWA | |
CON | Let | 2020-01-30 |
CON | Award Contract | 2020-02-09 |
CON | Start of Phase | 2020-03-11 |
CON | Notice to Proceed | 2020-03-16 |
CON | Completion of Phase | 2021-07-26 |
CON | Physical Work Complete | 2022-02-07 |
CON | Phase on Approved STIP | |
CON | Project Agreement End Date | 2023-08-17 |