❮ Back

80104 | Henry Ave Corridor Safety Improvements, Phase 1 (Philadelphia City)

This 4.0 mile corridor consists of Henry Avenue from Lincoln Drive (near the Wissahickon Creek) to Port Royal Avenue through Philadelphia’s Roxborough neighborhood. Improvements will include: "hand/man" pedestrian signals at all locations; installing centerline rumble strips at all painted median locations where appropriate; performing selective tree removal where appropriate based on crash cluster information and will consider removing all trees from curbed median areas; installing reflective pavement markers to better delineate the travel lanes along the median and in between lanes; and installing enhanced signage. Many of the improvements to this corridor will not only improve safety and potentially reduce crashes but will also address congestion.
The anticipated benefits of this project are to: reduce the frequency of both reportable and non-reportable crashes that is occurring at the signalized intersections and mid-block locations; increase capacity at the signalized intersection for the daily peak travel periods; provide signal coordination to better manage traffic flows during peak periods and incidents; reduce the severity of the reportable crashes; and mitigate the crash clusters. The corridor improvements have been broken out to 2 separate projects. See companion project MPMS #102134.

Limits: Henry Ave. from Lincoln Drive to Port Royal Avenue
Air Quality Code: S6

FY2023 TIP for PA Program Years (in Thousands)

PhaseFundFY23FY24FY25FY26FY27-34
UTLHSIP*$350$0$0$0$0
UTLTOLL$0$0$0$0$0
CONHSIP$700$385$0$0$0
CONTOLL$0$0$0$0$0
Program Year Totals:$1,050$385$0$0 
Total FY23-FY26 Cost:$1,435Total FY23-FY34 Cost:$1,435 
All costs in thousands.

Milestones

PhaseMilestoneEstimated Date
UTLPlan to Utility Unit2019-02-15
UTLPhase Approved by PMC
UTLStart of Phase2019-02-15
UTL4232 Approved by FHWA
UTLCompletion of Phase2020-08-21
UTLPhase on Approved STIP