64220 | US 422 Expressway Reconstruction (M03) (North Coventry Township, Chester County)

Reconstruction of approximately one mile of expressway including one bridge carrying SR 0422 over Ramp GH at the SR 0724 Interchange; and one bridge carrying Keim Street over SR 0422. The Keim Street Bridge will provide 16’-6” of vertical clearance with SR 0422. SR 0422 horizontal radii will be increased to meet current design standards including stopping sight distance as well as increased shoulder widths and vertical clearance. SR 0422 will be reconstructed with a 9 foot left shoulder, 2-12 foot lanes, and a 12 foot right shoulder in each direction of travel. A concrete glare screen will be provided for physical separation between eastbound and westbound traffic. Acceleration and deceleration lanes at Keim Street Interchange and PA 724 Interchange will be improved to meet current design standards. Also see MPMS #s14698, 16738, 64222, 66986, and 84308.

Limits: Keim Street to PA 724 Interchange
Air Quality Code: S19

FY2023 TIP for PA Program Years (in Thousands)

PhaseFundFY23FY24FY25FY26FY27-34
FDSTU$0$1135$0$0$0
FDTOLL$0$0$0$0$0
FDNHPP$0$5865$0$0$0
ROW581$0$0$0$0$153
ROWNHPP$0$0$0$0$609
UTLNHPP$0$0$0$0$573
UTL581$0$0$0$0$143
CONNHPP$0$0$0$0$65506
CON581$0$0$0$0$16373
Program Year Totals:$0$7,000$0$0 
Total FY23-FY26 Cost:$7,000Total FY23-FY34 Cost:$90,357 
All costs in thousands.

Milestones

PhaseMilestoneEstimated Date
ROWStart of Phase2006-03-15
UTLStart of Phase2006-03-15
UTLPhase Approved by PMC
ROWPhase Approved by PMC
CONPhase Approved by PMC
UTLCompletion of Phase2009-02-15
ROWCompletion of Phase2009-08-15
FDCompletion of Phase2012-02-15
FDPhase Approved by PMC
FDStart of Phase2021-07-15
FDPhase on Approved STIP
FD4232 Approved by FHWA
UTLPlan to Utility Unit2023-06-30
ROWPlan to ROW Unit2023-12-15
CONCompletion of Phase2024-06-23
FDPS+E to District Contract Management2025-12-16
CONLet2027-06-24
CONAward Contract2027-07-15
CONNotice to Proceed2027-08-16
CONStart of Phase2027-08-16
CONPhysical Work Complete2029-12-19
CONProject Agreement End Date2031-06-19