16216 | Pennswood Road Bridge Over Amtrak/SEPTA Paoli Rail Lines (Lower Merion Township, Montgomery County)
Replacement of the existing structure carrying Pennswood Road over Amtrak. It is anticipated that traffic will be detoured during construction. There will be minimal roadway approach work. The existing conditions include 2 – 12’ travel lanes and sidewalks on both sides. The proposed conditions include 2 – 14’-6” lanes and 5’ sidewalks on both sides. Sufficiency Rating: 26.0
A final alternative for bridge rehabilitation or replacement is determined upon federal National Environmental Policy Act (NEPA) or state Categorical Exclusion clearance.
Limits: Over Amtrak/SEPTA Paoli Rail Lines
Air Quality Code: S19
Phase | Fund | FY23 | FY24 | FY25 | FY26 | FY27-34 |
---|---|---|---|---|---|---|
UTL | BOF | $180 | $0 | $0 | $0 | $0 |
UTL | LOC | $11 | $0 | $0 | $0 | $0 |
UTL | 183 | $34 | $0 | $0 | $0 | $0 |
Program Year Totals: | $225 | $0 | $0 | $0 | ||
Total FY23-FY26 Cost: | $225 | Total FY23-FY34 Cost: | $225 | |||
All costs in thousands. |
Phase | Milestone | Estimated Date |
---|---|---|
UTL | Start of Phase | 2003-12-15 |
UTL | Phase Approved by PMC | |
UTL | 4232 Approved by FHWA | |
UTL | Completion of Phase | 2008-04-15 |
UTL | Plan to Utility Unit | 2009-03-15 |
UTL | Cash Flow Start | 2016-01-08 |
UTL | Cash Flow End | 2016-02-08 |
UTL | Phase on Approved STIP |