118024 | US 202 and High Street Interchange (Westtown Township & West Goshen Township, Chester County)

The scope of the project has three major elements: (1) The addition of one lane inside of the US 202 NB ramp. US 202 NB traffic in the right lane is able to turn onto either ramp lane at the exit. Traffic merging from High Street is stop-controlled; (2) The addition of one lane on the inside of the US 202 SB ramp. The existing center median is converted to an auxiliary merge lane to Old Wilmington Pike so that traffic on SB High Street has more time to merge. The roadway is slightly realigned, but no additional right-of-way is needed; (3) The addition of a left turn lane (40 feet with a 145-foot taper) from EB Matlack Street to NB US 202.

Air Quality Code: S2

FY2023 TIP for PA Program Years (in Thousands)

PhaseFundFY23FY24FY25FY26FY27-34
PESTU$384$450$0$0$0
PESTP$616$0$0$0$0
FD581$0$0$0$0$500
UTL581$0$0$0$0$150
CONSTU$0$0$0$0$3000
Program Year Totals:$1,000$450$0$0 
Total FY23-FY26 Cost:$1,450Total FY23-FY34 Cost:$5,100 
All costs in thousands.

Milestones

PhaseMilestoneEstimated Date
PEPhase Approved by PMC
PEPhase on Approved STIP
UTLPhase Approved by PMC
FDPhase Approved by PMC
CONPhase Approved by PMC
PE4232 Approved by FHWA
PEStart of Phase2023-03-30
PECompletion of Phase2023-10-30
UTLStart of Phase2023-11-01
FDCompletion of Phase2024-11-01
UTLCompletion of Phase2024-11-01
FDStart of Phase2024-12-30
CONStart of Phase2025-10-30
CONPhysical Work Complete2027-10-30
CONCompletion of Phase2027-12-29
CONProject Agreement End Date2029-04-29