115424 | US 322 West Chester Bypass Safety Improvements (West Goshen Township & East Bradford Township, Chester County)
The proposed scope of this project include:
• Removal of passing lanes in the Pottstown Pike interchange
• Extension of acceleration and deceleration lanes of the ramps of the Pottstown Pike interchange
• Narrowing of lanes from 12’-13’ to 11’ to ensure a minimum shoulder width of 5’
• Installation of bicycle-tolerable shoulder and centerline rumble strips, as well as bicycle tolerable storm grates
• Replacement of guide rail to MASH standards with approved end treatments, removal of turndowns, and protection of bridge wing walls
• Replacement of mast arms and addition of overhead street lighting at the Phoenixville Pike intersection
• Implementation of wrong way countermeasures at the Pottstown Pike and SR 0202 interchanges
• Installation of retroreflective backplates on signals
• Addition of exclusive left turn lanes at New Street intersection
Phase | Fund | FY23 | FY24 | FY25 | FY26 | FY27-34 |
---|---|---|---|---|---|---|
CON | HSIP | $4039 | $0 | $0 | $0 | $0 |
Program Year Totals: | $4,039 | $0 | $0 | $0 | ||
Total FY23-FY26 Cost: | $4,039 | Total FY23-FY34 Cost: | $4,039 | |||
All costs in thousands. |
Phase | Milestone | Estimated Date |
---|---|---|
CON | Phase Approved by PMC | |
CON | Final Utility Clearance | |
CON | 4232 Approved by FHWA | |
CON | Phase on Approved STIP | |
CON | Let | 2022-12-08 |
CON | Award Contract | 2023-01-07 |
CON | Notice to Proceed | 2023-01-30 |
CON | Start of Phase | 2023-02-06 |
CON | Completion of Phase | 2023-08-25 |
CON | Physical Work Complete | 2024-01-05 |
CON | Project Agreement End Date | 2024-12-24 |