115422 | West Chester Pike Safety Improvements (West Chester Borough & West Goshen Township, Chester County)
The proposed scope of this project includes:
• Installation of pavement marking, chevrons, curve warning signs, mill and overlay pavement with sections of high friction surface treatment (HFST) on West Chester Pike from Prospect Ave to Morris Road;
• Installation of pavement marking, signage, mill and overlay pavement with sections of high friction surface treatment (HFST) on West Chester Pike at the intersection with Concord Road;
• Increase left storage length of the existing unsignalized intersection at the Route 202 NB on ramp and West Chester Pike EB;
• Improve pavement marking and signage at the northbound on ramp with the West Chester Pike westbound on ramp to Route 202;
• Closure of the median break and the installation of a right-out access on West Chester Pike at the intersection with Patrick Avenue ;
• Restriping to remove one travel lane on Paoli Pike in the WB direction from Prospect Ave to Westtown Road;
• Restriping East Gay Street in the WB direction to N. Worthington Street to provide a two-lane section (road diet);
• Partial extension of the median on WB East Gay Street (west of Westtown Road);
• West Chester Pike/East Gay Street WB 2 lane scissor ramp and EB Market Street 2 lane scissor ramp to Paoli Pike, reduction to single lane;
• Remove temporary flexible post median delineators and create permanent extension of median at EB West Chester Pike and Spring Lane;
• Shoulder improvements with striping and signing to intersection of Golf Club Apartment/Shopping Center signal on WB West Chester Pike from Spring Lane;
Signal improvements:
• The conversion of the Route 202 SB off ramp stop-controlled intersection to a signalized intersection;
• Installation of pavement markings, mill and overlay pavement with sections of high friction surface treatment (HFST) on West Chester Pike at the intersection with Five Points Road;
• Investigate pavement marking improvements of EB West Chester Pike right turn lane drop from the Route 202 northbound off ramp to Five Points Road.
Phase | Fund | FY23 | FY24 | FY25 | FY26 | FY27-34 |
---|---|---|---|---|---|---|
FD | HSIP | $0 | $126 | $0 | $0 | $0 |
CON | CRPU | $500 | $0 | $0 | $0 | $0 |
CON | HSIP | $0 | $2117 | $0 | $0 | $0 |
Program Year Totals: | $500 | $2,243 | $0 | $0 | ||
Total FY23-FY26 Cost: | $2,743 | Total FY23-FY34 Cost: | $2,743 | |||
All costs in thousands. |
Phase | Milestone | Estimated Date |
---|---|---|
FD | Phase Approved by PMC | |
CON | Phase Approved by PMC | |
FD | Phase on Approved STIP | |
CON | Phase on Approved STIP | |
FD | 4232 Approved by FHWA | |
FD | Start of Phase | 2022-12-30 |
FD | PS+E to District Contract Management | 2023-10-01 |
CON | Let | 2024-01-25 |
CON | Award Contract | 2024-02-24 |
CON | Start of Phase | 2024-03-25 |
CON | Notice to Proceed | 2024-03-25 |
CON | Physical Work Complete | 2025-08-01 |
CON | Completion of Phase | 2025-09-30 |
FD | Completion of Phase | 2026-05-11 |
CON | Project Agreement End Date | 2027-01-30 |