112525 | Citywide 3R 111 (Philadelphia City)

The intent of a ‘3R’ project is to restore roadway surfaces to fully functional and optimal conditions while making whatever improvements are necessary to bring the roadway up to current standards. Typical components include base repair, milling & overlay, drainage improvements, signal modernization, and guiderail improvements. All street segments will be milled and resurfaced with bituminous material and restriped. All ground disturbance will occur within the existing right-of-way. This project will provide smoother riding surfaces for enhanced traffic movement; install pavement markings for better direction for motorists, bicyclists, and pedestrians, and upgrade non-compliant ADA ramps to current standards. Bike lanes will be included as the road widths allow. All roadway segments will be evaluated for low-cost safety improvements to reduce the risk of crashes; the segments on 21st, 58th, Cecil B. Moore, Diamond, Ford, Front, Packer, Tabor, Wyncote, and Wyoming are part of the Vision Zero High Injury Network, a network of Philadelphia streets with the highest rates of fatalities and severe injuries per mile, and will receive particular attention.
34th, Poplar, Red Lion, Sedgley, and Warfield are all part of the National Highway System (NHS).
Potential Street Segments include:
21st St (G013) MARKET ST to OREGON AVE (Minor Arterial)
22nd St (G031/ G108) RIDGE AVE to W ERIE AVE (Collector/Minor Arterial
34th St (G051) Walnut St to Market St; LANCASTER AVE to MANTUA AVE (Principal Arterial)
49th St (G520) Baltimore Ave to WOODLAND AVE (Collector)
58th St (G065) HOFFMAN AVE to LINDBERGH BLVD (Collector)
59th St (G230) LANSDOWNE AVE to LANCASTER AVE (Collector)
6th St (G002) WASHINGTON AVE to OREGON AVE (Collector)
7th St (G003) OREGON AVE to PATTISON AVE (Minor Arterial)
Arch St (G711) N 16TH ST to N 23RD ST (Collector)
Ashburner St (G118) FRANKFORD AVE to STATE RD (Minor Arterial)
Ashton Rd (G205) HOLME CIR to GRANT AVE (Minor Arterial)
Bells Mill Rd (G181) RIDGE AVE to GERMANTOWN AVE (Minor Arterial)
Bloomfield Ave (G158) PINE RD to KREWSTOWN RD (Collector)
Cecil B Moore Ave (G036) RIDGE AVE to N 33RD ST (Collector)
Cemetery/Chester Ave (G086/G527) 65TH ST to WOODLAND AVE (Minor Arterial)
Diamond St (G032) N 5TH ST to N 33RD ST (Minor Arterial)
Ford Rd (G152) GREENLAND DR to MONUMENT RD (Minor Arterial)
Front St (G005) E VENANGO ST to E ROOSEVELT BLVD (Collector)
Greenland Dr (G152) MARTIN LUTHER KING DR RAMP N to FORD RD (Minor Arterial)
Hagys Mill Rd (G182) PORT ROYAL AVE to SPRING LN (Minor Arterial)
Ivy Hill Rd (G499) STENTON AVE to CHELTENHAM AVE (Collector)
Lefevre/ Margaret St (G104) ARAMINGO AVE to RICHMOND ST (Minor Arterial)
Locust St (G709) W WASHINGTON SQ to S 18TH ST (Collector)
Manayunk Ave (G526) RIDGE AVE to ROXBOROUGH AVE (Collector)
Orthodox St (G102) ARAMINGO AVE to RICHMOND ST (Minor Arterial)
Oxford Ave (G121) FRANKFORD AVE to OXFORD CIR (Minor Arterial)
Packer Ave (G042) S FRONT ST to S BROAD ST (Minor Arterial)
Poplar Dr (G029) SEDGELEY DR to W GIRARD AVE (Principal Arterial)
Red Lion Rd (G164) CITY BOUNDARY to BUSTLETON AVE (Principal Arterial)
School House Ln (G105) GERMANTOWN AVE to RIDGE AVE (Minor Arterial)
Sedgeley Dr (G029) KELLY DR to LEMON HILL DR (Principal Arterial)
Spring Ln (G181) HAGYS MILL RD to Ridge Ave (Minor Arterial)
Strawberry Mansion Brg (G152) MARTIN LUTHER KING DR RAMP N to STRAWBERRY MANSION DR (Minor Arterial)
Susquehanna Ave (G572) N Front St to N BROAD ST (Collector)
Tabor Rd (G083) RISING SUN AVE to ADAMS AVE (Minor Arterial)
Warfield St (G734) WHARTON ST to MOORE ST (Collector)
Wyncote Ave (G137) E CHELTEN AVE to OGONTZ AVE (Minor Arterial)
Wyoming Ave (G054) N BROAD ST to CASTOR AVE (Collector/ Minor Arterial)

Limits: City of Philadelphia
Air Quality Code: S10

FY2023 TIP for PA Program Years (in Thousands)

PhaseFundFY23FY24FY25FY26FY27-34
PESTP$424$0$0$0$0
PELOC$106$0$0$0$0
CONSTP$0$0$0$0$20312
CONLOC$0$0$0$0$5972
Program Year Totals:$530$0$0$0 
Total FY23-FY26 Cost:$530Total FY23-FY34 Cost:$26,814 
All costs in thousands.

Milestones

PhaseMilestoneEstimated Date
PEPhase Approved by PMC
PEPhase on Approved STIP
CONPhase Approved by PMC
PE4232 Approved by FHWA
CONPhase on Approved STIP
PEN. E. P. A. Approval2024-04-15
PECompletion of Phase2024-05-15
CONLet2025-01-30
CONAward Contract2025-03-01
CONNotice to Proceed2025-04-01
CONStart of Phase2025-04-01
CONPhysical Work Complete2027-07-15
CONCompletion of Phase2027-09-13
CONProject Agreement End Date2029-01-12