❮ Back

107553 | SR30 & Airport Rd Interchange Improvement (West Caln Township & Valley Township, Chester County)

The planned Airport Road Interchange project (US 30, Section AIR) is being undertaken in conjunction with corridor wide improvements planned for the 14.5-mile US 30 Coatesville – Downingtown Bypass. The project extends along US 30 from approximately 1,500 feet east of the highway’s bridge over Old Mill Road in Sadsbury Township to approximately 0.2 miles east of Wagontown Road in Valley Township. Planned work will consist of the full reconstruction of US 30 to upgrade the existing roadway which is approaching the end of its serviceable life. The Airport Road interchange will be reconfigured to address the short acceleration/deceleration ramp lengths and add the missing westbound entrance and eastbound exit ramps. As part of the interchange reconfiguration turning lanes will be added to Airport Road and West Highland Boulevard will be relocated to align with Highland Boulevard/Airport Road intersection. The project will also address deficient median conditions, shoulder widths and the functionally obsolete bridges (Airport Road over US 30 and US 30 over Wagontown Road) within the project limits. No additional travel lanes are proposed for any of the project roadways
This is a breakout of MPMS #84884

Limits: 1,500' east of bridge o/ Old MillRd in Sadsbury to approx. 0.2 miles east of Wagontown Rd in Valley
Air Quality Code: 2045M

FY2023 TIP for PA Program Years (in Thousands)

PhaseFundFY23FY24FY25FY26FY27-34
FD581$0$903$903$903$0
FDNHPP$0$1623$0$3613$0
FDSTU$0$1990$3613$0$0
ROW581$0$0$0$1176$3528
ROWNHPP$0$0$0$4706$14118
UTL581$0$0$0$0$1366
UTLNHPP$0$0$0$0$5465
CONNHPP$0$0$0$0$69486
CONSTU$0$0$0$0$25714
CONSPK-NHPP$0$0$0$20000$10000
CON581$0$0$0$5000$26298
Program Year Totals:$0$4,516$4,516$35,398 
Total FY23-FY26 Cost:$44,430Total FY23-FY34 Cost:$200,405 
All costs in thousands.

Milestones

PhaseMilestoneEstimated Date
CONPhase Approved by PMC
UTLPhase Approved by PMC
ROWPhase Approved by PMC
FDPhase Approved by PMC
UTLStart of Phase2020-09-01
ROWStart of Phase2020-09-01
ROWPhase on Approved STIP
FDPhase on Approved STIP
CONPhase on Approved STIP
FDStart of Phase2023-03-01
UTLPlan to Utility Unit2023-05-15
ROWPlan to ROW Unit2023-07-15
ROWCompletion of Phase2025-09-01
UTLCompletion of Phase2025-09-01
FDPS+E to District Contract Management2025-09-15
CONLet2026-01-29
CONAward Contract2026-03-05
CONStart of Phase2026-04-04
FDCompletion of Phase2026-04-04
CONNotice to Proceed2026-04-04
CONPhysical Work Complete2029-03-03
CONCompletion of Phase2029-05-02
CONProject Agreement End Date2030-09-01