96069 | Bucks and MontCo Bridge Group
Stoney Garden Rod over Kimples Creek: The proposed scope of work includes removal of the existing bridge and construction of a precast concrete box culvert with structure-mounted guide rail on a similar alignment. The project also includes the installation of scour protection measures. The structure will be slightly widened from the existing 23 foot curb-to-curb width to 24 feet.
Salford Street over Br. Perkiomen Creek: The proposed project will rehabilitate the existing masonry arch culvert structure, remove the bituminous pavement and earth fill; rebuild deteriorated portions of the spandrel walls and wingwalls; place lightweight concrete fill; construct a full-width moment slab over the structure with integral Type 10M barriers; and repair, clean, and seal the arch intrados. The approach and bridge roadway pavement will be replaced at full depth and the attached guide rails will be replaced in accordance with current standards. The curb-to-curb width will be widened from 19’ to 20’. The Type 10M rail and guide rail will be painted brown. A detour, for traffic control, will be implemented during construction for approximately four months.
Church Road over Br. Perkiomen Creek: The proposed scope of work includes construction of a precast concrete box culvert with structure-mounted guide rail to replace the existing bridge. The approach roadway will be replaced at full depth and guide rails will be replaced in accordance with current standards. The project also includes the installation of scour protection measures. The structure will be widened from the existing 24 foot curb-to-curb width to 28 feet.
Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
---|---|---|---|---|---|---|
FD | 185 | $200 | $0 | $0 | $0 | $0 |
CON | 185 | $0 | $1750 | $1000 | $750 | $0 |
Program Year Totals: | $200 | $1,750 | $1,000 | $750 | ||
Total FY25-FY28 Cost: | $3,700 | Total FY25-FY36 Cost: | $3,700 | |||
All costs in thousands. |