81225 | Girard Point Bridge Rehab - Phase 1
Perform repairs to five (5) bridges carrying I-95 between Enterprise Avenue and Broad Street, including the main Girard Point Bridge. Proposed repairs on the four (4) approach bridges to the main Girard Point Bridge include: a Polyester Polymer concrete (PPC) overlay of the deck, replacement of the deck joints, replacement of bridge barriers, structural steel repairs, cleaning and painting of the superstructure, replacement of steel rocker and fixed bearings with laminated elastomeric bearing pads, construction of concrete pedestals, concrete repairs to substructure, replacement of drainage, and replacement of lighting. Proposed work on the main Girard Point Bridge is primarily to address priority repairs identified in recent inspections. The scope of work includes: concrete deck and deck joint repairs, structural steel repairs, bearing repairs, concrete repairs to substructure, and cleaning of drainage system. A pier protection system will also be installed to protect the bridge pier (Pier 8) in the river from impact by errant river traffic.
Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
---|---|---|---|---|---|---|
CON | 185-IM | $3840 | $0 | $0 | $0 | $0 |
CON | NHPP-IM | $14560 | $34560 | $27560 | $4560 | $30375 |
CON | 581-IM | $0 | $3840 | $3840 | $3840 | $3840 |
CON | BRIP-IM | $22838 | $1972 | $0 | $32190 | $4185 |
Program Year Totals: | $41,238 | $40,372 | $31,400 | $40,590 | ||
Total FY25-FY28 Cost: | $153,600 | Total FY25-FY36 Cost: | $192,000 | |||
All costs in thousands. |