This project provides for the widening of US 202 for approximately 2.3 miles from two lanes to five lanes including a center turn lane in this section of US 202 between Township Line Road and Morris Road In East Norriton & Whitpain Twps. Intersections along the project will be improved by adding lanes where necessary on both the mainline and side roads to provide adequate intersection capacities. New traffic signals will be installed. A coordinated ITS and traffic signal operating system will be integrated into the project. Improvement will also take place at two offline intersections, North Wales Rd./Township Line Rd. and Arch Rd/Township Line Rd. to improve traffic flow through the area during construction. Additional work will include stormwater management and drainage improvements; sound wall constructions; concrete sidewalk, pedestrian curb ramps, pavement marking, signage; and landscaping. This section is designed under Section 610. MPMS #50364 (US 202 Sec 610) contains the final design funding for this project. See MPMS #'s 63491, 63486, and 63490 for construction sections.
In the DVRPC region, US 202 covers 61 miles, traversing 27 municipalities in Delaware, Chester, Montgomery, and Bucks counties. For planning purposes, US 202 has been divided into seven major sections (100 through 700), and some of those sections have been broken down further to simplify construction management.
Project CMP (Congestion Management Process) commitments include strategies such as improvements for transit users, bicyclists, pedestrians, and drivers on the existing road network (operations). See DVRPC’s 2007 annual memoranda on supplemental strategies for details related to this project.
TOLL CREDIT

Limits: Township Line Road to Morris Road
Air Quality Code: 2035M

FY2025 TIP for PA Program Years (in Thousands)

PhaseFundFY25FY26FY27FY28FY29-36
CON581$1200$0$0$0$0
CONNHPP$4800$0$0$0$0
Program Year Totals:$6,000$0$0$0 
Total FY25-FY28 Cost:$6,000Total FY25-FY36 Cost:$6,000 
All costs in thousands.