48201 | DVRPC Competitive CMAQ Program (Various)

The Congestion Mitigation and Air Quality Improvement Program (CMAQ) was established by ISTEA and continued under TEA-21, SAFETEA-LU, and MAP-21. CMAQ funds are allocated to the states for use in non-attainment and maintenance areas for projects that contribute to the attainment of the Clean Air Act standards by reducing emissions from highway sources. Project types that are eligible for CMAQ funding include bicycle and pedestrian facilities; traffic flow improvements; ridesharing and other demand management programs; alternative fuel vehicles; and public transit improvements.
During a round of the DVRPC Competitive CMAQ Program, a call for projects goes out, applications are submitted, and candidate projects are ranked and selected by the DVRPC Board based on their emissions reduction potential, as well as other criteria such as cost-effectiveness, ease of implementation, project readiness, and sponsor commitment to provide matching funds.
The following projects selected in the calendar year 2011-2012 Competitive CMAQ Program will have funds drawn down from this Line Item at the appropriate time:
MPMS #96221 - Multi-modal Access to New Britain Train Station -$212,000 ($169,600 CMAQ/ $42,400 Matching funds)
MPMS #96215 - City Avenue Adaptive Signals - $1,143,500 ($800,000 CMAQ/ $343,500 Matching funds)
MPMS #96222 - Enhanced Bike Facility Connection between Gray’s Ferry and Bartram’s Garden - $600,000 ($400,000 CMAQ/ $200,000 Matching funds)
MPMS #96227 - Traffic Operations Center Cameras - $600,000 ($480,000 CMAQ/ $120,000 Matching funds)
MPMS# 96238 - Upper Merion to Bridgeport Train Station Pedestrian Facilities Improvements - $260,253 CMAQ/ $304,832 Matching funds)
MPMS# 96240 - Park Road Trail - $1,455,908 ($764,726 CMAQ/ $691,182 Matching funds)
The following projects selected in the calendar year 2016 Competitive CMAQ Program will have funds drawn down from this Line Item at the appropriate time:
1) MPMS# 107636 - Neshaminy Greenway Trail -$2,279,000 ($1,823,000 CMAQ/ $456,000 Matching funds)
2) MPMS# 107630 - Paoli Pike Trail Segment D-E -$2,415,000 ($1,736,000 CMAQ/ $679,400 Matching funds)
3) MPMS# 107652 - US 202/US 1 ITS Corridor -$3,300,000 ($3,300,000 CMAQ/ State Matching funds)
4) MPMS# 107642 - Smithbridge Rd. Corridor Improvement Project -$2,027,500 ($1,589,500 CMAQ/ $438,000 Matching funds)
5) MPMS# 107639 - Installation of Adaptive Signal Control Along Route 3 -$700,000 ($560,000 CMAQ/ $140,000 Matching funds)
6) MPMS# 107634 - Pedestrian Enhancements for Media Borough -$909,818 ($727,854 CMAQ/ $181,964 Matching funds)
7) MPMS# 107649 - Connecting Wallingford to Mass Transit -$471,162 ($370,168 CMAQ/ $100,994Matching funds)
8) MPMS# 107650 - Easton Road Traffic Signal System Project -$975,244 ($780,195 CMAQ/ $195,049Matching funds)
9) MPMS# 107644 - Fayette Street Traffic Signal Improvements – Phase 2 -$870,999 ($799,606 CMAQ/ $71,393 Matching funds)
10) MPMS# 107640 - Route 463 Traffic Signal System Project -$1,141,450 ($913,160 CMAQ/ $228,290 Matching funds)
11) MPMS# 107646 - West Main Street Traffic Signal Improvements -$551,455 ($487,825 CMAQ/ $63,630 Matching funds)
12) MPMS# 107654 - Advancing CNG in Philadelphia -$7,154,000 ($2,000,000 CMAQ/ $3,350,000 Matching funds)
13) MPMS# 107637 - Ramping up to Rapid Transit on Roosevelt Boulevard -$2,989,500 ($1,999,500 CMAQ/ $990,000 Matching funds)
14) MPMS# 107648 - Reformatting N. 5th Street as a Complete Street -$2,575,000 ($2,020,000 CMAQ/ $555,000 Matching funds)
15) MPMS# 107632 - Fox Chase Lorimer Trail -$1,004,700 ($868,700 CMAQ/ $136,000 Matching funds)
16) MPMS# 107631 - Navy Yard Contra Flow Loop Shuttle -$845,040 ($416,280 CMAQ/ $428,760 Matching funds)
The following projects selected in the calendar year 2019 Competitive CMAQ Program will have funds drawn down from this Line Item at the appropriate time:
1) MPMS #114093 - SEPTA Work Train Locomotive Replacement - $6,000,000 ($3,800,000 CMAQ/ $2,200,000 Matching funds)
2) MPMS #114096 - Falls Township Adaptive Traffic Signal System - $1,335,900 ($1,084,720 CMAQ/ $251,180 Matching funds)
3) MPMS #114164 - Nutt Road (SR 0023) and Starr Street Operational Improvements - $1,3000,856 ($868,656 /$432,200 Matching funds)
4) MPMS #114166 - PA 401 and Valley Hill Road Intersection Improvements - $2,110,000 CMAQ
5) MPMS #114167 - Naamans Creek Road and Wilmington-West Chester Pike Dual Left Turn Lanes - $668,900 ($535,100/ $133,800 Matching funds)
6) MPMS #114102 - West Chester and Route 476 Improvements - $2,849,000 CMAQ
7) MPMS #114112 - Media Bypass ITS Corridor - $5,000,000 CMAQ
8) MPMS #114114 - Traffic Flow Improvements – Conshohocken State Rd (SR 0023) and Spring Mill Rd (SR 3032) - $943,490 ($754,792 CMAQ/ $188,698 Matching funds)
9) MPMS #114116 - Skippack Pike Traffic Signal System - $962,007 ($892,007 CMAQ/ $70,000 Matching funds)
10) MPMS #114172 - Dreshertown Rd Cross County Trail Extension - $4,642,200 ($1,892,200 CMAQ/ $2,750,000 Matching funds)
11) MPMS #114173 - Roosevelt Blvd Cross Over Lanes - $1,500,000
12) MPMS #110415 - Schuylkill River Park Extension – Christian to Crescent - $50,622,771 ($1,650,000 CMAQ/ $48,972,771 Matching funds)
13) MPMS #114174 - Indego 2.0: Increasing Core Capacity - $3,122,000 ($2,250,000 CMAQ/ $872,000 Matching funds)

Limits: Region-wide
Air Quality Code: NRS

FY2025 TIP for PA Program Years (in Thousands)

PhaseFundFY25FY26FY27FY28FY29-36
CONCAQ$5730$2922$4856$4295$29076
Program Year Totals:$5,730$2,922$4,856$4,295 
Total FY25-FY28 Cost:$17,803Total FY25-FY36 Cost:$46,879 
All costs in thousands.

Milestones

PhaseMilestoneEstimated Date
CONPhase Approved by PMC
CON4232 Approved by FHWA
CONAward Contract2004-08-14
CONNotice to Proceed2004-09-13
CONCash Flow Start2004-10-15
CONStart of Phase2004-09-13
CONCompletion of Phase2030-12-31
CONCash Flow End2011-06-27
CONPhase on Approved STIP