❮ Back

116838 | I-76 Flex Lanes: US 202 to I-476 (Montgomery County)

Preliminary Engineering is being completed under the parent project, #106662.
This project involves the widening for Flex Lanes to provide increased capacity during peak periods and to allow for dynamic lane management during emergency operations, weather events and maintenance activities. To incorporate Flex Lanes, the existing roadway will be widened symmetrically about the centerline from two lanes to three lanes in each direction. The new third lane will be utilized during times of peak demand and will serve as a shoulder during all other times. The existing median will also be widened to provide a consistent 4' wide inside shoulder in each direction. Emergency pull off areas and emergency/maintenance access ramps will also be added.

Limits: I-76 (Schuylkill Expressway) between the US 202 interchange and the I-476 interchange
Air Quality Code: 2035M

FY2025 TIP for PA Program Years (in Thousands)

PhaseFundFY25FY26FY27FY28FY29-36
FDNHPP-IM$7500$7500$0$0$0
ROWNHPP-IM$0$0$5000$5000$0
UTLNHPP-IM$0$6000$6000$0$0
CONNHPP-IM$0$0$0$30000$250000
Program Year Totals:$7,500$13,500$11,000$35,000 
Total FY25-FY28 Cost:$67,000Total FY25-FY36 Cost:$317,000 
All costs in thousands.

No milestones are available for this project.