113765 | Christopher Columbus Blvd Corridor
This work is the planning and project development activities of conceptual level plans, engineering studies and environmental mitigations for the reconstruction of Interstate 95 connections and effects between Oregon and Spring Garden streets for the given limits on Christopher Columbus Boulevard (SR 2001) and selected local connecting streets in the City of Philadelphia that will have been identified as integral to the reconstruction of the I-95 mainline in the (MPMS 104243) I-95 Conceptual Study. That study has established limits of design and construction sections, determined a sequence of delivery based on site and asset conditions as well as related issues on a corridor level. This project will be more specific and detailed analysis and project development of a preferred alternative of what will ultimately lead to preliminary engineering and environmental clearance.
Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
---|---|---|---|---|---|---|
STUDY | NHPP | $500 | $500 | $0 | $0 | $0 |
Program Year Totals: | $500 | $500 | $0 | $0 | ||
Total FY25-FY28 Cost: | $1,000 | Total FY25-FY36 Cost: | $1,000 | |||
All costs in thousands. |