107554 | (Chester County)

The planned SR 82 Interchange project (US 30, Section 082) is being undertaken in conjunction with corridor wide improvements planned for the 14.5-mile US 30 Coatesville – Downingtown Bypass. The project extends along US 30 from approximately 0.2 miles east of Wagontown Road in Valley Township to 0.1 miles west of the SR 340 bridge over US 30 in Caln Township. Planned work will consist of the full reconstruction of US 30 to upgrade the existing roadway which is approaching the end of its serviceable life. Reconfiguration of the interchange with SR 82 will be undertaken to address substandard acceleration/deceleration ramp lengths and poor geometry of the westbound exit ramp. The project will also address deficient median conditions, shoulder widths and the functionally obsolete bridges (US 30 over W. Brandywine Creek, US 30 over SR 82, & US 30 over Moore Road) within the project limits. Reconfiguration of the SR 82/SR 340 intersection will also be undertaken as part of the project to improve movement through the intersection. No additional travel lanes are proposed on any of the roadways involved in the project.
This is a breakout of MPMS #84884.

Limits: 0.2 miles east of Wagontown Rd in Valley to 0.1 miles west of SR 340 bridge o/ US 30 in Caln

FY2025 TIP for PA Program Years (in Thousands)

PhaseFundFY25FY26FY27FY28FY29-36
ROW581$0$0$0$0$3040
CONNHPP$0$0$0$0$44742
CONSTU$0$0$0$0$95451
ROWNHPP$0$0$0$0$12162
FDSTU$0$0$0$0$4766
CONSTP$0$0$0$0$11642
FDNHPP$5085$0$0$0$0
UTL581$0$0$0$0$4697
CON581$0$0$0$0$65335
FD581$1271$0$0$0$1192
CONSPK-NHPP$0$0$0$0$30000
Program Year Totals:$$$$ 
Total FY25-FY28 Cost:$Total FY25-FY36 Cost:$ 
All costs in thousands.

No milestones are available for this project.