T05 | Bridge and Tunnel Rehabilitation (Various)
This program funds the design, repair, rehabilitation, replacement, painting, and inspection of tunnels and bridges. The program funds other work related to the movable bridge program, drawbridge power program, and right-of-way improvements necessary to maintain a State of Good Repair (SOGR) for culverts, bridges, and tunnels.
Limits: Bridge and Tunnel Rehabilitation
Air Quality Code: M9
Phase | Fund | FY24 | FY25 | FY26 | FY27 | LFY28-33 |
---|---|---|---|---|---|---|
Construction | STATE | $0.970 | $0.970 | $0.970 | $0.970 | $5.822 |
Construction | STBGP-OS-BRDG | $39.100 | $0 | $0 | $0 | $0 |
Program Year Totals: | $40.070 | $0.970 | $0.970 | $0.970 | ||
Total FY24-FY27 Cost: | $42.980 | Total FY24-FY33 Cost: | $48.802 | |||
All costs in millions. |