DR1802 | Subway Structures Renovation (Various)
This program will provide for preventive repairs of pedestrian bridges, tunnels, subway stations, pump rooms owned by PATCO including but not limited to miscellaneous steel repair, concrete repair, joint filler, painting, waterproofing, and tunnel leakage mitigation throughout the PATCO High Speed Line System.
Limits: PATCO High Speed Line System
Air Quality Code: M8
Phase | Fund | FY24 | FY25 | FY26 | FY27 | LFY28-33 |
---|---|---|---|---|---|---|
Construction | SECT 5337 | $3.440 | $3.840 | $2.480 | $1.100 | $0 |
Construction | DRPA | $0.860 | $0.960 | $0.620 | $0.275 | $0 |
Program Year Totals: | $4.300 | $4.800 | $3.100 | $1.375 | ||
Total FY24-FY27 Cost: | $13.575 | Total FY24-FY33 Cost: | $13.575 | |||
All costs in millions. |