D1906 | CR 581 (Commissioners Road), Bridge over Oldman's Creek (Gloucester, Salem County)
This project will address the deficiencies of the existing bridge structure and dam at the County Line Bridge, 8-F-2, Commissioners Road (CR581) over Oldmans Creek. The project will also restore the structural integrity and safety of this important link between Gloucester and Salem Counties in accordance with AASHTO, NJDOT and NJDEP Dam Safety Standards. Bicycle and pedestrian access over the bridge will also be provided.
Built in 1912, County Bridge 8-F-2 is deemed structurally deficient and functionally obsolete. The bridge is a 36-foot long single span, reinforced concrete arch culvert with fill. The bridge carries one lane of traffic in each direction, with a curb-to-curb width of 22.5 feet, which is slightly narrower than the roadway approaches. The Preliminary Preferred Alternative (PPA) is Alternative 5: remove the existing spillway, replace the existing bridge with a new 30-foot clear span bridge, and regrade the bottom of Algonkin Lake to create a new stream channel. The existing roadway profile will remain unchanged.
Phase | Fund | FY24 | FY25 | FY26 | FY27 | LFY28-33 |
---|---|---|---|---|---|---|
Construction | 17-STATE-DVRPC | $3.095 | $0 | $0 | $0 | $0 |
Program Year Totals: | $3.095 | $0 | $0 | $0 | ||
Total FY24-FY27 Cost: | $3.095 | Total FY24-FY33 Cost: | $3.095 | |||
All costs in millions. |