13319 | (Burlington County)
This project will address congestion and safety issues within the project limits through the widening of Route 73 to three through lanes in each direction, increasing approaches at the intersections of Route 73 and Brick Road and Route 73 and CR 544, and removing the unsignalized Route 73 southbound left turn to Commonwealth Drive. Additional sidewalks will be included in the proposed project to complete the gaps in the existing sidewalk network.
Limits: Evesham Rd
| Phase | Fund | FY24 | FY25 | FY26 | FY27 | LFY28-33 |
|---|---|---|---|---|---|---|
| Design | NHPP | $0 | $0 | $3.250 | $0 | $0 |
| Construction | NHPP | $0 | $0 | $0 | $0 | $23.840 |
| Right of Way | NHPP | $0 | $0 | $0 | $0 | $10.700 |
| Preliminary Engineering | NHPP | $5.500 | $0 | $0 | $0 | $0 |
| Program Year Totals: | ||||||
| Total FY24-FY27 Cost: | Total FY24-FY33 Cost: | |||||
| All costs in millions. | ||||||