Comment
X239 | Sign Structure Inspection Program (Various)
This program provides funding for the inspection of overhead and cantilever sign structures on state roadways. There are over 1,700 sign structures, including overhead, cantilever and variable message structures on state routes. This program also provides for the inspection of approximately 200 high mast light pole structures on state roadways.
Limits: Sign Structure Inspection Program
Air Quality Code: X11
Phase | Fund | FY26 | FY27 | FY28 | FY29 | LFY30-35 |
---|---|---|---|---|---|---|
Construction | STATE | $2.100 | $2.100 | $2.100 | $2.100 | $12.600 |
Program Year Totals: | $2.100 | $2.100 | $2.100 | $2.100 | ||
Total FY26-FY29 Cost: | $8.400 | Total FY26-FY35 Cost: | $21.000 | |||
All costs in millions. |