D1305 |

This project will provide for the planning, design, and construction to rehabilitate Pedestrian Bridges and Tunnels. The projects will allow for preventive repairs of bridges and tunnels owned by PATCO, including structural steel and concrete repairs, installation of protective coatins, miscellaneous steel repair, joint filler and spot paint.

Limits: Pedestrian Bridge and Tunnel Rehabilitation

FFY2026 TIP for NJ (FFY26-FFY29) Program Years (in Millions)

PhaseFundFY26FY27FY28FY29LFY30-35
ConstructionDRPA$0$0$0.125$0.125$0.125
ConstructionSECT 5337$0$0$0.500$0.500$0.500
Program Year Totals:
Total FY26-FY29 Cost:Total FY26-FY35 Cost: 
All costs in millions.

No milestones are available for this project.