Comment
99372 | Orphan Bridge Reconstruction (Various)
This program provides funding for engineering and construction of orphan bridges. The bridges will be designed utilizing in-house and task order designers. The bridges will be reconstructed in the existing footprint, with the abutments being repaired, and the superstructures being replaced with prefabricated/precast systems whenever possible.
Limits: Orphan Bridge Reconstruction
Air Quality Code: S19
Phase | Fund | FY26 | FY27 | FY28 | FY29 | LFY30-35 |
---|---|---|---|---|---|---|
Construction | STATE | $3.000 | $3.000 | $3.000 | $3.000 | $18.000 |
Program Year Totals: | $3.000 | $3.000 | $3.000 | $3.000 | ||
Total FY26-FY29 Cost: | $12.000 | Total FY26-FY35 Cost: | $30.000 | |||
All costs in millions. |