102569 | Maintenance & Transportation Facilities (SEPTA)

This program provides for improvements to SEPTA's bus and rail maintenance shops, administrative facilities, and office buildings. This program includes ongoing renewal and replacement of programs including but not limited to the wheel truing, bus and steel wheel lift, fire suppression, boilers and vehicle washer shop and yard upgrades, and paving improvements. In addition, this program includes new facilities and rehabilitation of existing facilities as well as a roof rehabilitation and replacement program. Remediation and clean up activities at select facilities as well as activities that will reduce SEPTA’s carbon footprint and enhance SEPTA’s commitment to sustainability are also included in this program.
Currently programmed projects include:
- 1234 Market SOGR - $45M (Prior Years – FY 2031)
- Boiler Replacement Program - $7.10M (FY 2025 - FY 2036)
- Bus Lift Program - $12.77M (FY 2025– FY 2036)
- Courtland Shop Improvements - $22.50 (Prior Years – FY 2028)
- Decatur Warehouse Purchase & Upgrades – $15M (Prior Years – FY 2026)
- Environmental Cleanup - $28.51M (Ongoing)
- Facilities Critical Infrastructure Program - $51.45M (Ongoing)
- Facilities Furnishings Program $8.55M (Ongoing)
- Frazer Transportation Building - $37M – (Prior Years – FY 2028)
- Frazer Rail Shop and Yard Upgrade* - $139.00M (Prior Years – FY 2026)
- Garage/Shop Overhead Doors - $7.66M (FY 2030 – FY 2036)
- Maintenance Shop Equipment Program - $53.29MM (Ongoing)
- Maintenance Facilities Improvement Program - $39.46M – FY 2030 – FY 2036)
- Powelton Yard Facility Improvements - $6.50M (Prior Years - FY2026)
- Steel Wheel Lift Program - $14.26M (FY 2025 – FY 2029)
- Vehicle Washer Program - $23.30M (Prior Years - FY2028)
- Wheel Truing Program Phase 2 - $10.81MM (FY 2025 – FY 2029)
- Wyoming Complex Storm Water Retrofits - $13.35M (Prior Years – FY 2026)
- Victory Shop and Storage (Phase 2) - $18.75M (Prior Years – FY 2028)
- Maintenance Facilities Improvement Program -$55M (FY 2028 – FY 2034)
- ZEB Fleet Transition Facility Upgrades** - $150M (Prior Years - FY 2032)
*Frazer Rail Shop & Yard Upgrade- Phased upgrade of the Frazer Maintenance Facility to accommodate the expansion of SEPTA’s railcar and locomotive fleets including multi-level cars. Work includes extending existing storage tracks and adding new storage tracks; major upgrades to the repair shop and equipment, including the wheel truing machine and drop table; construction of a shop extension, new cleaning track, train washer building, storage building and yardmaster building; utility upgrades and stormwater improvements. In addition, the roof will be replaced, and mechanical equipment will be replaced. The budget for this project is $139 million.
**Zero Emission Bus Fleet Transition Facility Upgrades $150M (Prior Years - FY 2032)
SEPTA is planning for a full transition to ZEBs, which could include a combination of Battery Electric Buses and Fuel Cell Electric Buses, by the year 2040, if adequate funding is made available for the investments that will be necessary to charge and fuel these new buses. SEPTA has secured $107.66 M for ZEB infrastructure projects through the FTA’s Low or No Emissions Vehicle Program. Projects include:
-Midvale ZEB Infrastructure Project ($5.75M total)
-Allegheny, Callowhill, and Comly ZEB Power Resiliency Project ($29.2M total)
-ZEB Transition Facility Safety & Resiliency Improvements ($100M total)
Overall, these projects will provide for the design and construction of additional or upgraded electric infrastructure including power feeders, backup generators, substations, ventilation enhancements, and fire safety improvements at Midvale, Allegheny, Callowhill, Comly, Frankford, Frontier, Germantown, Southern, and Victory bus depots. These upgrades will make it possible for SEPTA to start procuring a significant number of ZEBs in the next few years. SEPTA will continue to apply for funds through the FTA Low-No program to advance this transition.

Limits: System-wide
Air Quality Code: M11

FY2025 TIP for PA Program Years (in Thousands)

PhaseFundFY25FY26FY27FY28FY29-36
ERCDISFUND$0$36241$27691$0$0
ERCLOC$1727$1558$664$1442$6102
ERC1514$51809$16913$19936$43271$183126
ERC5307$2400$2400$2400$4000$30696
ERC5339(C)$50000$47720$0$0$0
Program Year Totals:$105,936$104,832$50,691$48,713 
Total FY25-FY28 Cost:$310,172Total FY25-FY36 Cost:$530,096 
All costs in thousands.

No milestones are available for this project.