DVRPC has published over one thousand reports from the 1970s to present. Product abstracts and/or PDF downloads are available.
May 23, 2013

This technical report compiles aircraft operations estimates for seven non towered Airports in the Delaware Valley Region. Eight acoustic counts were taken at each airport, starting in April 2011 and ending in March 2012; each sample extended over the period of one week. The samples were extrapolated over the entire year and the
results are presented in this report. Results are used by multiple sources……
May 1, 2013

A CMP is a systematic process to manage congestion. It identifies specific multimodal strategies for all locations in the region to minimize congestion and enhance the ability of people and goods to reach their destinations. The CMP advances the goals of the DVRPC Long-Range Plan and strengthens the connection between the Connections plan and the Transportation Improvement Program
(TIP). The 2012……
April 18, 2013

This project included both a detailed analysis of operations and passenger activity at Norristown Transportation
Center (NTC) and the development of a conceptual program of improvements to enhance the facility and its
integration with the Norristown community over time. The recommendations detailed here would represent
improvements to circulation that encourage increased transit ridership, development……
April 10, 2013

This study is a continuation of the planning effort that began with the Routes 611/263 Corridor Study conducted by DVRPC with the Phase 1 and Phase 2 reports completed in 2008 and 2009 respectively. The Phase 2 report developed a list of improvement recommendations for the
corridor. This corridor wide project is focused on transit service accessibility and improvement. With bus and rail transit coverage……
April 9, 2013

In the coming years, there will be dramatic growth in the
population of older adults as the “Baby Boomer” generation
(those born between 1946 and 1964) ages to 65 years old and beyond. A looming challenge is to meet the mobility needs of this group to ensure that older adults can live independently.
However, while the number of older adults grows, the funding available for specialized senior and……
March 4, 2013

This study was conducted by DVRPC to generate and evaluate potential improvements to a portion of Haverford Road between Hathaway Lane, near the Ardmore Junction Station of the Norristown High Speed Line (NHSL), and the Wynnewood Road/Eagle Road, near the Wynnewood Road Station of the NHSL. This study was initiated as part of the implementation of recommendations from the recently completed US 30 (Lancaster……
March 1, 2013

This report details the process and findings of phase two of the database review of train and trolley crashes in the Delaware Valley Regional Planning Commission region. The study area is predominantly Philadelphia but also examines Delaware County, where SEPTA’s Routes 101 and 102 trolleys operate and the Routes 11 and 13 trolleys terminate. Using the Pennsylvania Department of Transportation crash……
March 1, 2013

New Jersey Transit’s River LINE light rail service has not been surveyed since it opened in spring of 2004. This survey was used to update demographic profiles and determine travel patterns of riders using the River LINE. The River LINE was surveyed in both directions, north and south, and the focus was on the AM peak period of travel.
March 1, 2013

This study was conducted by DVRPC to generate and evaluate potential improvements to a portion of Haverford Road between Hathaway Lane, near the Ardmore Junction Station of the Norristown High Speed Line (NHSL), and Wynnewood Road/Eagle Road, near the Wynnewood Road Station of the NHSL. This study was initiated as part of the implementation of recommendations from the recently completed US 30 (Lancaster……
March 1, 2013

This study is a continuation of the planning effort that began with the Routes 611 & 263 Corridor Study conducted by DVRPC with Phase 1 and Phase 2
completed in 2008 and 2009, respectively. The Phase 2 report presented a list of improvement recommendations for the corridor. The current project developed one of these: to provide a uniform, coordinated community
wayfinding signing plan throughout the……