DVRPC has published over one thousand reports from the 1970s to present. Product abstracts and/or PDF downloads are available.
June 1, 2016
Alternatives Development for Roosevelt Boulevard Transit EnhancementsDVRPC conducted this project to take a fresh look at transit needs for the Roosevelt Boulevard corridor in response to public requests for improved transit. This project’s focus was on developing improvement strategies that could be achieved at grade within the existing cross section, at comparatively lower cost and in a shorter timeframe than the subway/elevated line that has historically been the…
May 25, 2016
Analysis of Modernization Scenarios for SEPTA Route 34This project used microsimulation software to test the travel time and delay outcomes of various trolley
modernization scenarios for the street-running portions of SEPTA Route 34. The microsimulation analysis
was built on a prior DVRPC Transit First analysis of Route 34 (pub. 09040, March 2010), updated to reflect
new 2014 baseline traffic and transit conditions. This effort also included an initial…
May 11, 2016
Making Freight Data More Accessible - SHRP2 C20: Local Freight Data ImprovementWith support of the Strategic Highway Research Program (SHRP2) C20 Local Freight Data Improvement program, the Delaware Valley Regional Planning Commission (DVRPC) established and advanced a comprehensive freight data improvement program for the DVRPC Region. This project sought to improve access and usability of a variety of data sets for regional freight planning through innovative analysis and visualization.…
April 15, 2016
Horsham Township Energy Assessment: Police BuildingOn behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Horsham Township Police Building. The Horsham Township Police Building (13,800 ft2) is a modern, one-story building constructed in 2009. The building uses an energy intensive “reheat” system for summertime dehumidification, which is a conventional technology that requires a significant…
April 15, 2016
Greater Philadelphia Future ForcesThis effort builds scenarios off a set of Future Forces of change in Greater Philadelphia. Future Forces may accelerate or reverse current trends, or create new ones that significantly impact demographics, development patterns, use of the regional transportation system, the economy, and/or the environment. These Future Forces were identified collaboratively by the Greater Philadelphia Futures Group…
April 15, 2016
Upper Darby Township Energy Assessment: Township Administration BuildingOn behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Upper Darby Administration Building. The Upper Darby Township administration building (45,034 ft2) is a 1929 heavy masonry block building with offices, conference rooms, a large hearing room, a parking garage, and storage space. It is typically occupied about 50 hours per week. PES evaluated…
April 15, 2016
Cheltenham Township Energy Assessment: Township Administration BuildingOn behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Cheltenham Township Administration Building. PES evaluated the building’s HVAC, lighting, and envelope for opportunities to save energy at this building. PES identified significant opportunities to improve and upgrade the building’s steam heating system. Additional recommendations were…
April 15, 2016
Phoenixville Borough Energy Assessment: Civic CenterOn behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Phoenixville Borough Civic Center. The Phoenixville Borough Civic Center (estimated at 32,160 ft2) is a multiuse recreational facility with an attached high-bay gymnasium constructed in 1908. PES identified a three-step strategy to improve operational control and efficiency of the buildings…
April 15, 2016
Nether Providence Township Energy Assessment: Township Administration BuildingOn behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Nether Providence Township Administration Building. The Nether Providence Township Administration Building (10,200 ft2) is a multiuse facility with administrative offices, a council meeting room, finance offices, and the police department. The building is a 1902 stone barn renovated in…
April 15, 2016
Horsham Township Energy Assessment: Township LibraryOn behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Horsham Township Library Building. The Horsham Township Library Building (28,000 ft2) is a modern, one-story building constructed in 2004, and is occupied 65 hours per week. PES performed a general walkthrough of the Horsham Township library and an analysis of the library’s stack lighting…