DVRPC Products

DVRPC has published over one thousand reports from the 1970s to present. Product abstracts and/or PDF downloads are available.

April 15, 2016

Horsham Township Energy Assessment:  Township LibraryHorsham Township Energy Assessment: Township Library
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Horsham Township Library Building. The Horsham Township Library Building (28,000 ft2) is a modern, one-story building constructed in 2004, and is occupied 65 hours per week. PES performed a general walkthrough of the Horsham Township library and an analysis of the library’s stack lighting……

Read More

April 15, 2016

Upper Darby Township Energy Assessment:  Township Administration BuildingUpper Darby Township Energy Assessment: Township Administration Building
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Upper Darby Administration Building. The Upper Darby Township administration building (45,034 ft2) is a 1929 heavy masonry block building with offices, conference rooms, a large hearing room, a parking garage, and storage space. It is typically occupied about 50 hours per week. PES evaluated……

Read More

April 15, 2016

Horsham Township Energy Assessment:  Police BuildingHorsham Township Energy Assessment: Police Building
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Horsham Township Police Building. The Horsham Township Police Building (13,800 ft2) is a modern, one-story building constructed in 2009. The building uses an energy intensive “reheat” system for summertime dehumidification, which is a conventional technology that requires a significant……

Read More

April 15, 2016

Cheltenham Township Energy Assessment:  Township Administration BuildingCheltenham Township Energy Assessment: Township Administration Building
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Cheltenham Township Administration Building. PES evaluated the building’s HVAC, lighting, and envelope for opportunities to save energy at this building. PES identified significant opportunities to improve and upgrade the building’s steam heating system. Additional recommendations…

Read More

April 15, 2016

Bristol Township Energy Assessment:  Township Administration Building and Pump StationsBristol Township Energy Assessment: Township Administration Building and Pump Stations
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Bristol Township Administration Building. The Bristol Township administration building (32,160 ft2) is a multi-use facility housing administrative offices, as well as the police department, a community meeting room, and a large storage area. The primary finding is lack of control over……

Read More

April 15, 2016

Upper Darby Township Energy Assessment:  Senior CenterUpper Darby Township Energy Assessment: Senior Center
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed a walkthrough inerior lighting evaluation of the Upper Darby Township Senior Center . The Upper Darby Township Senior Center 15,234 ft2) is a one-story facility comprising an open seating and activity area, a large high-bay gymnasium with attached fitness and game rooms, administrative offices,…

Read More

April 15, 2016

Phoenixville Borough Energy Assessment:  Civic CenterPhoenixville Borough Energy Assessment: Civic Center
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Phoenixville Borough Civic Center. The Phoenixville Borough Civic Center (estimated at 32,160 ft2) is a multiuse recreational facility with an attached high-bay gymnasium constructed in 1908. PES identified a three-step strategy to improve operational control and efficiency of the buildings……

Read More

April 15, 2016

Lansdowne Borough Energy Assessment:  Borough HallLansdowne Borough Energy Assessment: Borough Hall
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Lansdowne Borough Hall/Police Building. The Lansdowne Borough Hall/Police Building (10,301 ft2) built in 1903 is a multi-use facility containing the township’s administrative offices, council meeting room, and police department. PES analyzed the building’s HVAC system and building envelope……

Read More

April 15, 2016

Towamencin Township Energy Assessment:  Township Administration BuildingTowamencin Township Energy Assessment: Township Administration Building
On behalf of the DVRPC Circuit Rider Program Practical Energy Solutions (PES) performed an energy assessment of the Towamencin Township Administration Building. The Towamencin Township administration building (16,068 ft2) is a multiuse facility containing offices, a Council meeting space, and storage. The building is a renovated barn that opened in 2000 and is typically occupied between 40 and 45 hours……

Read More

January 13, 2011

Energy Efficient Traffic Signals and StreetlightsEnergy Efficient Traffic Signals and Streetlights
Local governments provide outdoor lighting of many types, including outdoor area lighting (streets, roadways, parking lots, and pedestrian areas) and traffic signals. The electricity used for these lights can account for a significant portion of a local government’s energy bill. The production of the electricity that powers these lights can be a major source of local government greenhouse…

Read More

1 10
Air Quality Partnership
Annual Report
Connections 2050
Infrastructure Investment and Jobs Act (IIJA)
Economic Development District